Jump to content

usedboxman

Member
  • Posts

    33
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

usedboxman's Achievements

7

Reputation

  1. Just some timeline info on my recent F 450 build window sticker 1/14 Build date 1/24 Tough liner & retractable Tonneau cover installed offsite of KTP week of 1/24 - Shipped rail 1/30 offloaded from railcar on 2/5 In Philadelphia PA delivered to dealer 2/12 in NJ The date on the bottom of the window sticker changed at each step listed above.
  2. Cyberdman, Truck delivered to dealer today . Thank you for all of your help! Here is the first photo after coming off the truck.
  3. Does anyone know why the window sticker date located on the bottom in the center changes? on my superduty build it has changed at least 5 times since it first appeared on the tracking website. no big deal, just curious.
  4. If you can look for the 2021 superduty order guide that is posted on the blue oval forums by ice capades , go to page 11 and the rear axel codes are listed. f 350 DRW with 6.7L diesel the 3.55 limited slip order code is X3K. it is an optional rear the 3.55 non limited slip is standard. the VOC would show the axel code that was ordered . Ask your dealer for a copy of the VOC to confirm that the correct axel ratio was ordered. don't wait of the window sticker to confirm as it will be too late to change at that point if not correct.
  5. that's great news.. i guess my truck had some option that was not available and it held up the build. My truck was shipped so my wait should be over soon.
  6. Cyberdman, Any updates ? please : VIN 1FT8W4DT3MEC65677 Thank you!
  7. commodity issues I'm sure with certain options are messing up build times. from my observations the simpler the truck it seems to push thru the build process faster than the more loaded trucks with many options. it can just take one missing option to hold up a build . but knowing what exactly is holding up a build is anyone's guess.
  8. I feel your pain.... I ordered on 10/28 and was just built on 1/24 . Still at KTP waiting to be shipped. This Covid deal is messing up the supply chain in every industry . Hang in there it will be here soon...At least that is what I keep telling myself.
  9. if the order was pulled then the Vin was assigned. ask for the person at the dealer who handles the order bank they should be able to get the Vin.
  10. Cyberdman, Status update please : VIN 1FT8W4DT3MEC65677 Thank you!
  11. good luck on the 5- 8 week timeframe... i'm at 12 weeks now on my f450 build... and today is my build date 1/22 . eta to dealer is week of 2/8 if the truck gets delivered on 2/10 , it will be 14 weeks ...
  12. I wish all dealerships would take such care in placing customer orders. However from the many complaints on various forums, sadly it seems like your dealership is the exception.
  13. I know how you feel, took 3 dealers for even one to even look at my order. then dealer took my order and it have been like pulling teeth trying to get info from them. Thank god for this forum and it's members as i would still not know anything about the progress of my build.
  14. I was a life long International/Navistar owner... after being burned by Maxxforce disaster. i'll never go back... EGR coolers / valves/ turbo's every 100,000 miles ... owned the maxxforce for 3 years and it was in the shop for warranty work for 19 months of that time.
  15. Cyberdman, Thank you for the information. You have given me more information in 10 minutes than my dealer has in 10 weeks. I asked my salesman at the dealer for updates but i guess it was too much a bother for him to look. thanks again And ill send photo when it arrives.
×
×
  • Create New...