Jump to content

mitch8628

Member
  • Posts

    63
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by mitch8628

  1. Out with the Old: In with the new - Yesterday - 2022 F350 CCSB 6.7L Lariat Ultimate, 5th wheel prep, 20's, FX4, Moon Roof, Plow Prep
  2. Ordered June 3rd. Scheduled Aug 12. Built September 13. Shipped 9/14. Offloaded 9/20 in Chicago. Arrived at the dealer today - 9/24!! I get to go inspect it tomorrow morning and probably take delivery next week!
  3. Good Morning. Hope all is well. Have a good week! 1FT8W3BT3NEC58503 2022 F-350 6.7 CCSB Antimatter Blue, Lariat Ultimate, Snow Plow Prep F41793 Order 4491
  4. It's all over the map. I've been watching the spreadsheet over on FTE and review trucks that have been delivered to similar locations as mine. I'm right around 9-15 days for trucks delivered to Wisconsin and Minnesota where as the estimated days from Ford is 18.
  5. Hoping for a Thursday morning update and perhaps a rail car number, if that's available. The truck has shipped per the trackers on 9/13. Thanks!! 1FT8W3BT3NEC58503 2022 F-350 6.7 CCSB Antimatter Blue, Lariat Ultimate, Snow Plow Prep F41793 Order 4491
  6. What public tracker? Are talking about the spreadsheet that has originated over on Ford-Trucks.com? If so then you have to initiate being put on the spreadsheet by filling in the form at the top of the tracking spreadsheet thread over there.
  7. It takes time for the trackers to catch up. Ask him for a copy of the VVR, which is the most up to date. Otherwise, sooner or later the trackers will catch up. They go into production when the window sticker is made (or vise versa), about 6-8 days prior to your build date. Mine went into production on 9/7, window sticker available that evening. It was built yesterday, with a confirmation email overnight that it was built. Ordered on June 3, while I got the VIN and build week on August 12
  8. After you order, have the dealer send you a copy of the order. It should have the priority code on it.
  9. Oh Oh. Nice truck, but something happened.......That sucks!
  10. My original build week was 9/13. Per the tracker here on BOF, the original build day was 9/13. I contacted the dealer today and the build day was adjusted to 9/17. But, I just got the window sticker this evening using that exact link. So, things are happening, which is exciting. It'll come!
  11. I remember a thread where you said you weren't going to take delivery...Taking delivery now? Typical "sent to plant" appears to be 7-8 days prior to production date. I believe that is the date on the bottom of the sticker. Also, 28 days is an estimation. If you check the tracking spreadsheet over at Ford-Trucks, a lot of them are arriving ahead of schedule, but others are not. So hopefully it arrives before. Just depends on shipping availability.
  12. 5th Wheel Prep. Hope it doesn't affect already scheduled orders.
  13. My bad. I did read them, but forgot about that one. Appreciate it! Hopefully this is my last post on this thread then!
  14. Hello! Any changes to the schedule? 1FT8W3BT3NEC58503 2022 F-350 6.7 CCSB Antimatter Blue, Lariat Ultimate, Snow Plow Prep F41793 Order 4491 Thank you for your time!
  15. Put your VIN at the end of this URL and plug it into an address bar: https://www.windowsticker.forddirect.com/windowsticker.pdf?vin=
  16. Sounds like that is a normal weekend occurrence. Typically resolves on Monday, as said by the ones more into the tracking over on ford-trucks.
  17. I tow a Jayco 31BHS, 1988 Sea Ray Seville, a 20' Load Trail Car Hauler with wood, tractors, and more, and then I also push around a 2012 Western 8'6" MVP Plus in the winter!
  18. Wowser! Did you have a WDH on it when you did this, or get numbers with the WDH Hooked up? With our 2003 Jayflight 31BHS the tounge weight without the WDH is 1030 and with the Blue Ox hooked up the tongue weight was at 900 lbs. I have since changed to an Equalizer because the Blue Ox was terrible for that trailer. I'd love to get my hands on a Late model 5th Eagle HT 29.5 BHDS. Someday....
  19. Good Morning. Looking for an update. Thanks! 1FT8W3BT3NEC58503 2022 F-350 6.7 CCSB Antimatter Blue, Lariat Ultimate, Snow Plow Prep F41793 Order 4491
  20. Looks like 6" (6 holes) The 8" have 7 holes. I'm going to have to order a new one for the 2022 before it arrives. I'm assuming my F350 6.7 will have the 3.0" shank.
  21. Over on Ford-Trucks, the spread sheet of builds shows a bunch of Plati's scheduled to be built end of August into September. The 8/27 build date falls into the 8/23 build week and there are a bunch that week getting built, per the spreadsheet (Not just platinum's, also Lariat's, KR's, XL's, etc). They have already finished scheduling for the week of 8/23 as this Thursday tentatively planning to schedule for the week of 9/13.
  22. It appears they will be scheduling on 8/19 for a production week of 9/13. Production Week Scheduling Information - Page 30 - Production and Sales - Blue Oval Forums
×
×
  • Create New...