Jump to content

Ronix

Member
  • Posts

    29
  • Joined

  • Last visited

Everything posted by Ronix

  1. Cyberdman bumping trying to see if that truck has move much 1FT8W2BT5NEC73045 0150 thanks man
  2. Hello any chance I can get some info on tracking truck is heading to Naples Fl 1FT8W2BT5NEC73045 Order # 0150 thanks in advance
  3. Hey guys Hopefully everyone or a lot of you got lucky, and heard something yesterday Regarding your trucks. does anyone know about how long it takes from truck went into production to built? I know the Ford tracker doesn’t update frequently just trying to gauge what an average time frame is, I know it’s all different for everyone. Spray bed liner ect. thanks guys. my schedule for production isn’t till the week of the 20th but window sticker is pulling up.
  4. Seems that way. Although I thought their was a commodity issue with that. I’m still waiting on my second order which will probably never be built. But it has AS already had about 7 different built days
  5. Alright just pulled up my window sticker. Ordered 8/18 got a confirmation email the next day. scheduled for production 9/20. Platinum tremor no AS as this is my second order. I do have spray bed liner and 5th wheel prep Package.
  6. Alright gentlemen. I have two trucks on order one with AS which has had about 8 schedule weeks non will stick due to AS and just now I just received this email. So it just went from 10/15 to new date. In reality I don’t expect for this truck to be built this year the way this is going. As of right now my other order is schedule to be built the week of 9/20. No AS
  7. Mine is not showing on up yet so I will try this upcoming week. But it definitely starting to feel like it’s getting real haha thank guys.
  8. Mine is not showing on up yet so I will try this upcoming week. But it definitely starting to feel like it’s getting real haha thank guys.
  9. Okay thanks, mine is allegedly scheduled for production for the 20th so I was wondering how far out or when I should start checking for a window sticker.
  10. Hey guys, for those whose trucks have been built. about how far out were you guys able to pull up your window sticker before your truck went into production?
  11. The whole Scheduling system Is all messed up…… I have an original order placed on 6/1 platinum F250 Tremor with AS. Built week kept getting moved back due to the AS. Went to my dealer, Tried to remove it but they kept saying because it was scheduled 30 years from now i couldn’t make any changes. Since it was locked in. Pretty sure they didn’t know how to make changes.. Went ahead and placed an order for another truck same without AS. On 8/13 got a vin and scheduled the next day for 9/20. Which makes no sense on how they’re selections trucks to be built because guys Have been waiting for months.
  12. Adaptive steering and adaptive cruise control are two separate things. Not sure if you’re confusing them as you mentioned both
  13. So here it is. After trying to drop AS on my original Built that was placed on 6/1 with 5 different tentative built weeks due to AS. and the dealer not allowing me I went ahead and just put a whole new order in and just got this email today. Order was placed yesterday. I kept both trucks to see which one would get built first and as of right now it seems that the one I placed yesterday will be. built week September 20th
  14. Same dealer. They messed up my order i wanted the electric steps instead of the tremor ones but its not the end of the world. at this point i just want my truck built.
  15. So here it is. After trying to drop AS on my original Built that was placed on 6/1 with 5 different tentative built weeks due to AS. and the dealer not allowing me I went ahead and just put a whole new order in and just got this email today. Order was placed yesterday. I kept both trucks to see which one would get built first and as of right now it seems that the one I placed yesterday will be.
  16. Got the confirmation email from ford when I was still at the dealer. Had the dealer change the priority code to 12 which is the lowest they can assign. No production date yet wishful hoping that it’ll get picked up tomorrow and given a built week.
  17. Ice. so if our dealers aren’t willing to help us what other option do you Recommend? I highly doubt my truck will be built the week of 10/25 like they said. The dates keep getting pushed back. thanks in advance
  18. Just left the dealer. I went in trying to cancel adaptive steering from my current order F250 platinum tremor. I was told because it was schedule for 10/25 I was not able to make any changes? I’ve had about 4 different built weeks and with the recent news of them not building any trucks with adaptive steering. The dealer pretty much made me order a while new truck… without it……
  19. Just left the dealer. I went in trying to cancel adaptive steering from my current order F250 platinum tremor. I was told because it was schedule for 10/25 I was not able to make any changes? I’ve had about 4 different built weeks and with the recent news of them not building any trucks with adaptive steering. The dealer pretty much made me order a while new truck… without it……
  20. Removing adaptive steering today.I will keep you guys posted if my truck gets scheduled this upcoming Thursday
  21. It seems that alot of us got the same email. my built week has been changed 4 time already with the latest of 10/25 like your self. Also have AS so not sure if that's what keeps getting it pushed back. Dealer cant give me a straight answer F250 Platinum Tremor ordered June 1st
  22. Built week just got bumped again. Original date was 8/2, 9/6 and 9/20 now new date
  23. Yes. Contemplating on removing it but I’ve seen others being built with AS
  24. Initial built week just keeps getting pushed back went from 8/2 9/29 9/13 to this. Anyone else had this issue?
×
×
  • Create New...