Jump to content

aguyindallas

Member
  • Posts

    33
  • Joined

  • Last visited

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

aguyindallas's Achievements

9

Reputation

  1. I just got 75k for my diesel. It took 4/5 days to show up.
  2. My card has almost been punched. Ordered on 11/19. Built on 3/29. Shipped on 4/8 with ETA of 4/18-4/24.
  3. After build week switches from 3/28 to 4/4, back to 3/28, back to 4/4, I seem to be holding onto my 4/4 slot. I keep checking to see if an Monroney label has been created but nothing yet. I guess we will see what next week brings.
  4. 11/19 CCSB Platinum 6.7. I had Berliner and 5th wheel prep but dropped those in January.
  5. I was 3/28 then got moved into 4/4 and back, and then back to 4/4. I just got brought back to 3/28.
  6. Typically this is an automated thing that happens when the manufacturer invoices the dealer for the vehicle. At my dealership, Porsche electronically invoices us for the vehicle a day before it arrives. Once it hits our accounting system, it also is automatically fed to our website and web syndication software.
  7. I ordered same configuration basically and in the same day. I did drop the items that were in restraint. Build date has gone back and forth from 3/28 to 4/4 a few times.
  8. I was bumped from 3/28 into March, but got bumped into April….and got an email tonight bringing me back into 3/28 same….
  9. I was bumped from 3/28 into March, but got bumped into April….and got an email tonight bringing me back into 3/28
  10. I previously had a build schedule for week of 3/28 but got an email that shows it pushed a week, into April.
  11. Ordered 11/19. F250 Plat. It did have some items that I deleted a few weeks ago when everybody saw the commodity hold items (spray in bed liner, 5th wheel prep, gooseneck, folding tonneau cover). Build week is 3/28.
  12. And stand corrected…..just got my build scheduled.
×
×
  • Create New...