Jump to content

G8R

Member
  • Posts

    39
  • Joined

  • Last visited

Everything posted by G8R

  1. 2022 F250 King Ranch Ultimate 6.7L with factory spray in bedliner and the 5th wheel prep package, no AS. 10/19 Ordered 2/1 - scheduled for 3/7 2/4 - rescheduled to 3/14 2/11- rescheduled to 3/21 2/17- rescheduled to 4/4 2/18- rescheduled to 3/21 2/25- rescheduled to 3/28 3/16- rescheduled to 4/4 4/13 - built 4/20 - shipped ETA 5/2 to 5/8 4/20 (12 hours later) ETA bumped to 5/14 to 5/20 5/13 - delivered to dealer 5/17 - took delivery! IMG_6908.heic
  2. I'm surprised. It's my understanding that changes can't be made after you are scheduled for production, but who knows. I ordered 10/19, and am awaiting delivery of mine any day now, so I'll know soon if I made the right decision. Good luck with your order.
  3. Well, my suggestion is a little late, but I went with the carpet delete for my King Ranch, or should I say "premium vinyl floor covering" (since I paid extra to get it.) It hadn't really occurred to me until I saw a YouTube video review of a truck that had it. It was a nice looking floor, with the King Ranch emblem imprinted. An the floor mats end up covering most of the carpet anyway. The dog hair always finds its way to the little big of carpet that is showing.
  4. Anyone financing through Ford Motor Credit? What rates are people getting with? Are there any financing incentives offered?
  5. What rates are people getting with Ford Motor Credit? Are there any financing incentives offered?
  6. Happy Wednesday. Thanks for the help VIN 1FT7W2BT5NED85940
  7. Hoping for shipment! Thanks again for your help. VIN 1FT7W2BT5NED85940
  8. Thanks for doing this! VIN 1FT7W2BT5NED85940
  9. @Rangers09 Has yours shown as "Built" in the tracker?
  10. @Sh6l9by I'm 315/722 in that batch. The a date of 4/9 showed up beside the "In Production" portion of the timeline yesterday (4/10). When I checked this morning, the BCE module had populated in the AsBuilt data on the motorcraft website. Many have said that this indicates that the truck has been built. I have the spray in bed liner and 5th wheel prep kit, so it will be sent across the street from the plant to GFX for that installation. From what I have seen, the tracker can sometimes lag a day or so in posting updates. You should be ahead of me. Hopefully we will see "Built" on the tracker soon. Good luck!
  11. I too was scheduled for the week of 4/4, but never got scheduled for a particular date. Mine changed to in production, w/window sticker, on 4/1 as well. When I checked the tracker this morning, it now showed a date of 4/9 beside the "In Production" portion of the timeline. I agree that I think you would be before me with the lower batch number. I still don't have any BCE modules showing in the AsBuilt data on the Motorcraft site. Have you checked that? You can check it at https://www.motorcraftservice.com/AsBuilt
  12. I checked the tracker this morning, and it finally showed a date, 4/9/22 (yesterday) by the “In Production” mark on the timeline. I ordered a F-250 King Ranch Ultimate pkg, with bedliner and 5th wheel prep.
  13. I have not seen anywhere where I am scheduled for a particular day, just got the email that I was scheduled for the week of April 4. Are you scheduled for Sunday?
  14. Thanks. Window sticker shows 5170 315/722. I've been checking the motorcraft site, no BCE modules yet.
  15. The last email I got from Ford said I was scheduled to be built the week of 4/4. The tracker has shown my truck "In Production" since 4/1. I have seen in some posts where people end up showing a specific day for production in the tracker. Any thoughts?
  16. The tracker shows mine "In Production" (and has since 4/1) and the window sticker is still available. Not sure if the 4/1 change in status was an April Fool's joke or not, but it has stayed that way since.
  17. I actually got an email Friday night moving up to 3/21. Don’t give up!
  18. I'm just sliding in one direction -- 3/7, 3.14, 3/21 and now 4/4
  19. Originally 3/7, then 3/14, today pushed to 3/21. F-250 CCSB KR 6.7L w/ bedliner and 5th wheel prep
  20. Well, that didn’t take long. My scheduled production has already been pushed back a week.
  21. Woot! Scheduled for production the week of March 7. Ordered 10/19 - F0250 CCSB KR 6.7L w/ bedliner and 5th wheel prep. Tried dropping those several weeks ago, but dealer said it would let them. Anxiously waiting know with fingers crossed.
  22. I’m in a similar position position. Ordered F-250 CCSB KR 6.7L w/bed liner and 5th wheel prep (no tonneau), on 10/19/21. Sitting at Priority 2. Tried to drop the bed liner and 5th prep a couple weeks ago, was told the order was locked. Tried again earlier this week. That’s when I was told it was priority 2 and couldn’t be amended. I’ve read on this forum is that those can be amended, but must be done by Ford regional rep. Guess I’ll just keep waiting.
×
×
  • Create New...