Livonia Transmission The 6R product lineup continues with a substantial capacity increase, while
the 4R line balances out. Plant investment is $192M.
Copied and pasted from the contract highlights of 2011
Just posted @ Sandusky ACH with a end date of 04.03.2012 @ 4:00 PM. Report dates ASAP. Steps 4-6.
AAI 46
KTP 30
LIMA 14
LAP 1044
MAP F/A 25
ROUGE DEFTP 41
ROUGE DTP 75
SHARONVILLE 25
WOODHAVEN 20
Posted Tuesday (03.20.2012): 6 people moving from ACH Sandusky / Bellevue to Louisville on Monday 03.26.2012.
Posted Thursday (03.22.2012): Step 6 bid sheet for production to Rouge site, 12 to DDMP, 3 to DSP.
This was posted @ Sandusky ACH.
It was actually two posting for transfer to Chicago, 1 for production and a second for trades willing to go to production.
Production posting down yesterday @ 4:00 PM
Trades posting down today @ 4:00 PM
Maybe Ford should call India-based Varroc Group if they and Flex n gate cannot come to an agreement. India-based Varroc Group just agreed to buy the Visteon lighting business for about 91 million.
MOST have a leave date of 06.01.2012. Some are earlier. Some, if they are growing into their 30, have untill 12.31.2012 to leave. No, they can't change their mind now.