Jump to content

Trades reqs


uawfactoryrat

Recommended Posts

According to level and Captain723, all trade reqs must be decoded by the NSA using linked supercomputers to determine if the trades-persons DOE is correct. Linking all those computers together takes time, thus you might have a response before the end of the contract.

Link to comment
Share on other sites

According to level and Captain723, all trade reqs must be decoded by the NSA using linked supercomputers to determine if the trades-persons DOE is correct. Linking all those computers together takes time, thus you might have a response before the end of the contract.

LOL !! :hysterical::hysterical:

Link to comment
Share on other sites

There were postings for Mills, welders, and fitters TWO weeks ago. :redcard::redcard::redcard: Is this a record for taking the longest?

 

Was the posting sent by snail???????? :ohsnap:

 

The closed facilities have seen 8 weeks pass since the end of their open window. I think they are the current record holders... so sit back and get comfortable.

Link to comment
Share on other sites

According to level and Captain723, all trade reqs must be decoded by the NSA using linked supercomputers to determine if the trades-persons DOE is correct. Linking all those computers together takes time, thus you might have a response before the end of the contract.

 

Very nice...

Link to comment
Share on other sites

It's the waiting, and the not knowing that bother me. I could handle the waiting if I KNEW what was going on, if I thought that things were being handled correctly and fairly (that may be contradictory, correct AND fair) OHAP had 8 or 9 MW postings, they were filled, I'd like to know where they came from. I'm pretty easy, just post a notice on what is taking so long, how they are dealing with the issue and mostly POST who gets what openings and why. I know this is complicated, keeping us imformed should not be.

Link to comment
Share on other sites

It's the waiting, and the not knowing that bother me. I could handle the waiting if I KNEW what was going on, if I thought that things were being handled correctly and fairly (that may be contradictory, correct AND fair) OHAP had 8 or 9 MW postings, they were filled, I'd like to know where they came from. I'm pretty easy, just post a notice on what is taking so long, how they are dealing with the issue and mostly POST who gets what openings and why. I know this is complicated, keeping us imformed should not be.

 

Been there done that. Soon. Wait.

 

P.S. OHAP didn't fill anything, their openings are on the same list you are waiting for.

Link to comment
Share on other sites

Been there done that. Soon. Wait.

 

P.S. OHAP didn't fill anything, their openings are on the same list you are waiting for.

 

April 13, 2008

 

General Membership Meeting

 

 

 

Chairman’s Report:

 

We have 7 electricians transferring in, 8 millwrights, 3 pipefitters and 1 powerhouse employee. Nick has questions on the powerhouse person as we currently have 3 members in GEN from the powerhouse.

 

 

 

**Please note: These are not the official notes of the union meeting. These are only the personal notes of the author. These notes are in no way authorized, recognized or sanctioned by the Union, Ford Motor Company or any of their agents.

Respectfully submitted by Mary Springowski

 

So this isn't factual? I've tried hard to trace down fact, not rumor, but I'm not getting answers.

Link to comment
Share on other sites

 

 

So this isn't factual? I've tried hard to trace down fact, not rumor, but I'm not getting answers.

 

 

I can read. It says they have open req's and are waiting for people transferring to fill them. It doesn't say they were filled. They are in the same boat as everyone else. They could have made the same statement the last two months. Everyone knows they have people transferring in if they have open req's. That is all that was meant by this. However, I believe today they all may know more...........

Link to comment
Share on other sites

I did find out this much today. There are 40 M/Ws in JPS, with 1972 - 2005 Seniority. An email was sent up north asking for a break-down.

Hey Indy, is that number just ACH plants or is it 40 MW's throughout the Ford system? I believe there's 13 of us left, here at Wixom Assembly.

Link to comment
Share on other sites

Hey Indy, is that number just ACH plants or is it 40 MW's throughout the Ford system? I believe there's 13 of us left, here at Wixom Assembly.

 

There is about 35 and that is throughout the entire Ford/ACH system, I think there is only 6 left at Wixom And that seniority Indy MW posted is all wrong if he's talking DOE, there's no millwrights in JSP with 36 years!!!!!

Edited by level
Link to comment
Share on other sites

There is about 35 and that is throughout the entire Ford/ACH system, I think there is only 6 left at Wixom And that seniority Indy MW posted is all wrong if he's talking DOE, there's no millwrights in JSP with 36 years!!!!!

 

 

 

 

 

Hey, Level,

 

How many electricians in the Ford system (including Rawsonville and Sterling but not ACH) in Gen/JSP? Thanks!

 

And by the way, I appreciate your postings: you have a calm, intelligent way of handling things: you're great with words and I wonder if your name "Level" is for being Level-Headed...... :shades:

Link to comment
Share on other sites

There is about 35 and that is throughout the entire Ford/ACH system, I think there is only 6 left at Wixom And that seniority Indy MW posted is all wrong if he's talking DOE, there's no millwrights in JSP with 36 years!!!!!

Hey level, can you shed any light on the KCAP skilled trades transfers. TULSA AND NASHVILLE AND SEVERAL GEN/JSP HAVE SIGNED UP FOR KCAP. WE WERE ALL TOLD WE COULD GO THERE. ALL PRODUCTION HAS BEEN GIVEN DATES. IS THIS GOING TO HAPPEN? WHEN? LIMBOLAND SUCKS! TRADES ARE REAL PEOPLE TOO!WE HAVE LIVES TO TRY TO PLAN. ONCE AGAIN TRADES IS TREATED LIKE THE RED-HEADED STEPCHILD. :shades:ALSO PLEASE DON'T TELL ME ABOUT DOE AND HAL THE SUPER COMPUTER BECAUSE THAT DOESN'T APPLY HERE. WE WERE TOLD ANY AND ALL THAT SIGNED UP COULD GO. THIS WAS BEFORE NATIONAL TRADE REQS WENT UP!

Edited by takeme back 2blue
Link to comment
Share on other sites

There is about 35 and that is throughout the entire Ford/ACH system, I think there is only 6 left at Wixom And that seniority Indy MW posted is all wrong if he's talking DOE, there's no millwrights in JSP with 36 years!!!!!

 

There are 15 mw at Wixom,at least one with 88 DOE.

Link to comment
Share on other sites

Hey, Level,

 

How many electricians in the Ford system (including Rawsonville and Sterling but not ACH) in Gen/JSP? Thanks!

 

And by the way, I appreciate your postings: you have a calm, intelligent way of handling things: you're great with words and I wonder if your name "Level" is for being Level-Headed...... :shades:

 

Very few electricians in JSP, less than a dozen from closed plants. Electricians are in high demand at Chicago and KCAP.

Link to comment
Share on other sites

There is about 35 and that is throughout the entire Ford/ACH system, I think there is only 6 left at Wixom And that seniority Indy MW posted is all wrong if he's talking DOE, there's no millwrights in JSP with 36 years!!!!!

 

 

Those figures are what info my bargaining committeeman received, as of April 14th, 2008. He told me 40 M/Ws with seniority of 1972-2005, I only assumed it was M/W seniority, since that's what I asked about. I'll double check tomorrow.

Edited by IndyMW
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...