Jump to content

JSA

Member
  • Posts

    6
  • Joined

  • Last visited

Posts posted by JSA

  1. On 7/15/2022 at 9:46 AM, Big Jon said:

    2 months in shipping delays is childs play.? I'm at 110 days today. ?

    My brother in law ordered his the week of thanksgiving, not sure what all he got for options all I know is it’s a F250 6.7 Lariat with painted bumpers and black rims lol.  His was built 6/21 and he got the shipped email on 7/9 so it’ll be interesting to see how long it takes for it to show up.  He ordered from a different dealer than I did but they’re only 20ish miles apart so both of ours will come the same route except for the final leg of the journey, now if mine would just get off the in production status………..?

     

    I will add that the last time I talked to my salesman he said if mine wasn’t in by the time we go on our camping trip that he’d pull something off the lot for me to use for the weekend, he said it probably wouldn’t be the newest one on the lot but it’d be a 3/4 ton or 1 ton so I will say that’s one nice thing about small town dealerships at least the experiences I’ve had with them over the years!

  2. 11 hours ago, Boss Hog said:

    Dealer called this morning and truck was delivered.  Ordered 1/21/22, built 5/9/22 with no delays.  Went into shipping status 5/10/22 with 3 delays.  Lariat Ultimate, BAP w/ liner, SRW 6.7L.  Headed south tomorrow afternoon to take delivery Saturday morning.  

    WOW,.....2 months sitting in shipping!!!  LOL I'm sorry but that's nuts!.....not that I should talk, mine has been "In production" since June 23rd so that's probably why nobody else's are getting built, mine is holding up the line! ?

  3. On 6/19/2022 at 7:02 PM, 1972Mach1 said:

    I ordered two 2022 models. The first was a SCSB and got it as loaded as possible.  Lariats value is the highest trim package you can get and it does not come with the push button start. It also does not come with the LED option which seems really shortsighted to me. I added the higher trim and LEDs etc to a CCSB which was delivered. The first order is five days short of one year and still in production. 

     

    On 6/20/2022 at 6:51 AM, bshort said:

    This is your answer.  It was never going to come with push/start to begin with.  

    Call me "old school" but I'm hoping mine comes with a key LOL....F-350 CCSB Lariat value package

  4. I apologize if this has been asked and I missed it in my scan of this post, does anyone have a rough idea on the average time it takes to build a super duty?  I looked at the vehicle tracker on 6/23 and it said "In production", I scrolled down to view the window sticker and it wasn't available yet.  I checked on 6/27 and am now able to view the window sticker, however since then I get the same "In production" message.  Does it really take that long or is there an issue with the tracking system not updating?  Oh and last night I received an email stating it'd been 45 days since my last update and my build date/week was supposed to be 6/27 but with supply chain issues things will probably change and they apologize for it.  It seems odd to me it'd go into production before all the parts were available to build it but the way things seem to be going I'm not all that surprised LOL

     

    Not sure if it makes much difference but I ordered an F-350 6.2L SRW Lariat with minimal extras,... cab lights, center mounted back up camera and heated steering wheel is all I added.  Fifth wheel package and spray in bed liner had to be omitted when I placed my order back in February.

×
×
  • Create New...