I did get to see an overhead picture of some of the demo at Wixom, very disheartening. I do not know the lay out of the plant but the one building has outside walls left but most of the middle is gone.
At Wayne they have contract electricians removing switches from sub stations. Not sure what this meen's if anything but you can't feed power with out them. Even removing some of the busses from the ceiling. The ASRS building was torn down over the summer along with the enamel and prime oven buildings, paint mix building, now the E coat oven and abatement equipment is being demo'd. The equipment in the old north body at Wayne is only for the Escape. There is extra room in the old WAP/ISA south body, they could move that equipment there if need be. MAP is really pressed for space so they have moved some of the kitting over to WAP to free up room.