Jump to content

HarryTaint

Member
  • Posts

    105
  • Joined

  • Last visited

Everything posted by HarryTaint

  1. Join the party. Just think of the people who have been waiting since June or July for theirs. I ordered in Aug and don't have mine. You might be waiting for a while, hopefully not.
  2. Until I see in production I won't believe it bc this is the third build to day I've had.
  3. Another build date, cyber told me 3/15. Hopefully this one sticks, not holding my breath though. First build date was 2/24, then 2/27, then week of 2/27, then week of 3/14, and now 3/15. F250 Platinum CCLB 6.7 no constraints.
  4. Bump Cyberdman, 22 F250 Platinum CCLB 6.7 Ordered: 8/24 Dealer Code: F41224 Order Number: G824 VIN: 1FT8W2BT0NED70928  Thank you! 
  5. Has the tracker site been down? Every time I put my info in, it sends me right back to the same page where you put your info in.
  6. I was wondering the same thing traynoral. There are tons of people who's have ordered before me who still haven't been built yet. I ordered Aug 24.
  7. Maybe it's the seats or the moonroof delaying it. I don't know if those are the same seats I am getting and I don't have the moonroof.
  8. You saw the thing @ice-capades put on here about the wait time for those, correct? It's possibly a 29 week hold on those items give or take which puts 29 weeks end of July roughly. My dealer advised that orders for the 2023's start in Aug or so. So there's a chance you might not get a 22, I don't know though.
  9. I believe it's the spray in bed liner that comes with the BAP, and 5th wheel prep holding it up. I deleted the spray in bed liner, 5th wheel prep, tonneau, & AS. Then mine got scheduled the week after I deleted those items.
  10. What did you guys order? I ordered Aug 24, finally got a VIN and build date early Jan after deleting a bunch of options. I ordered a F250 Platinum CCLB scheduled for week of 3/14 as of now. Had build dates 2/24 & 2/27 then week of 2/27.
  11. When in Aug did you order and what did you order? I ordered Aug 24 and got a build date in Jan for Feb 24 but that has changed multiple times and now I have a build week of March 14. I have a F250 Platinum with no restraints after deleting all of them in Jan.
  12. Awesome, congrats! Post some pjs when you get it. What options do have on it? Bc that's the exact same trim I ordered.
  13. I dropped all those options plus tonneau back in Jan when I was told it would speed up my build and have been pushed back like everyone else to mid March. But, we are seeing builds with some of those options rolling out, getting really frustrating for everyone! I deleted AS, 5th wheel prep, spray in, and tonneau Jan 4.
  14. Just got pushed back again. First build was set for 2/24, then 2/27, then week of 2/27 now week of 3/14. Ordered 8/24 F250 Platinum no constraints after I deleted everything that was on hold. I'm about ready to cancel, this process is ridiculous. Order your dream truck, wait 7 months and counting, have to delete everything from it, and still can't get it built.
  15. What has been posted before is East STL which is IL is basically the distribution 'hub'. They are loaded on to rail cars there, then shipped across the country.
  16. 250. I had 2 day of builds 2/24 2/27 then it got changed to week of 2/28 so who knows now.
  17. Mine is also schedule for the week of 2/28. I'm D70. Hopefully we are all getting close!
  18. Oh gotcha. I believe it takes about 24 hours once a truck starts going down the line from start to finish, then about another day for offsite items like bedliner etc.
  19. The KTP produces about 80 vehicles per hour, but that was precovid. I would say there are more than 10 trucks being built at one time. We are only going by people on this forum of builds, how many thousands of people are not on this forum have ordered or received their truck. My dealer told me the Canada hwy shutdown would not affect superduty production, but who really knows at this point.
  20. Be patient be kind...not sure what you are talking about, I'm stating what I've read here and was replying to someone else who asked a question and letting them know what I've been told. Not sure how that is being unkind. I was told beginning of Jan that I need to delete tonneau, spray in bed liner, & 5th wheel prep bc if I kept those at that time it would be and additional 20-30 weeks from the beginning of Jan before my build was even considered getting a build date. That was straight from my dealer who was told by the regional rep to relay that message as to why I didn't have a build date yet.
  21. Call ford marketing and have them attach it to the order, that's what I had to do.
  22. All of those options are on 20-30 week commodity hold. My dealer told my beginning of Jan that I should delete those or else I would be waiting an additional 20-30 weeks. In addition to what you have I had tonneau cover. I deleted all of those beginning of Jan and 2 days later I got scheduled. I'm scheduled for 2/27.
×
×
  • Create New...