Is this something I could call Ford on if the dealer can’t? I only say the dealer is because the sales manager I ordered it from is out on vacation and I ordered it on 4/26 so based on what I’ve seen it could be scheduled for around the end of July or beginning of August.
I was reading on the Tremor forum this isn't the package you want as it reduces payload capacity, does another package need to be selected? I see this package on my invoice from the dealer and want to see if I can change it before the truck gets built. FWIW this is on a 7.3L gas truck.
In my opinion, the situations are different, right now there is semiconductor shortage, for the MY20 Ford had everything needed, just decided to wait to build them.
I don't think their is much difference in dollars between the MT21 and MY22. You could also build a MY21 and ask a dealer to build the same truck in a MY22. I know it's a hassle but better than waiting.