Per Friday's FDNB (Fleet Distribution News Bulletin) here's the production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 08/12/2021 - 2021MY Last Day to Spec Change
  • 11/05/2021 - 2021MY Balance Out Date

 

  • 06/21/2021 - 2022MY Order Bank Open Date
  • 09/16/2021 - 2022MY Scheduling Begins
  • 11/08/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 08/12/2021 - 2021MY Last Day to Spec Change
  • 11/05/2021 - 2021MY Balance Out Date

 

  • 08/16/2021 - 2022MY Order Bank Open Date
  • 09/16/2021 - 2022MY Scheduling Begins
  • 11/08/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the production timetable for the 2022MY E-Transit.

 

  • 06/21/2021 - 2022MY Order Bank Open Date
  • 09/16/2021 - 2022MY Scheduling Begins
  • 11/08/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 08/12/2021 - 2021MY Last Day to Spec Change
  • 11/05/2021 - 2021MY Balance Out Date

 

  • 08/31/2021 - 2022MY Order Bank Open Date
  • 09/16/2021 - 2022MY Scheduling Begins
  • 11/08/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 08/12/2021 - 2021MY Last Day to Spec Change
  • 11/05/2021 - 2021MY Balance Out Date

 

  • 08/16/2021 - 2022MY Order Bank Open Date
  • 09/16/2021 - 2022MY Scheduling Begins
  • 11/08/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 08/12/2021 - 2021MY Last Day to Spec Change
  • 11/05/2021 - 2021MY Balance Out Date

 

  • 09/10/2021 - 2022MY Order Bank Open Date
  • 09/16/2021 - 2022MY Scheduling Begins
  • 11/08/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 08/12/2021 - 2021MY Last Day to Spec Change
  • 11/12/2021 - 2021MY Balance Out Date
  •  
  • 09/10/2021 - 2022MY Order Bank Open Date**
  • 09/23/2021 - 2022MY Scheduling Begins
  • 11/15/2021 - 2022MY Job #1 Date

** Orders input prior to the order bank opening date (9/10), will not be eligible for scheduling. Orders will need to be deleted and resubmitted.

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 09/02/2021 - 2021MY Last Day to Spec Change
  • 11/23/2021 - 2021MY Balance Out Date
  •  
  • 09/10/2021 - 2022MY Order Bank Open Date**
  • 10/07/2021 - 2022MY Scheduling Begins
  • 11/23/2021 - 2022MY Job #1 Date

** Orders input prior to the order bank opening date (9/10), will not be eligible for scheduling. Orders will need to be deleted and resubmitted.

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 09/02/2021 - 2021MY Last Day to Spec Change
  • 12/13/2021 - 2021MY Balance Out Date
  •  
  • 09/10/2021 - 2022MY Order Bank Open Date**
  • 10/07/2021 - 2022MY Scheduling Begins
  • 12/14/2021 - 2022MY Job #1 Date

** Orders input prior to the order bank opening date (9/10), will not be eligible for scheduling. Orders will need to be deleted and resubmitted.

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 09/02/2021 - 2021MY Last Day to Spec Change
  • 12/17/2021 - 2021MY Balance Out Date
  •  
  • 09/10/2021 - 2022MY Order Bank Open Date**
  • 11/04/2021 - 2022MY Scheduling Begins
  • 12/20/2021 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 09/02/2021 - 2021MY Last Day to Spec Change
  • 12/23/2021 - 2021MY Balance Out Date
  •  
  • 09/10/2021 - 2022MY Order Bank Open Date**
  • 11/04/2021 - 2022MY Scheduling Begins
  • 01/03/2022 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

Per Friday's FDNB (Fleet Distribution News Bulletin) here's the updated production timetable for the 2021/2022MY Transit.

 

  • 03/24/2021 - 2021MY Final Fleet Order Due Date
  • 09/02/2021 - 2021MY Last Day to Spec Change
  • 12/22/2021 - 2021MY Balance Out Date
  •  
  • 09/10/2021 - 2022MY Order Bank Open Date
  • 11/04/2021 - 2022MY Scheduling Begins
  • 01/03/2022 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

INFORMATION
22MY Transit Connect Order Cancellations

 

ACTION REQUESTED

  • Certain scheduled 22MY Transit Connect orders needed to be cancelled due to supplier shortages at Balance Out.
  • Affected 22MY Stock and Retail orders were cancelled by Ford Motor Company. All allocation will be returned to the dealers in 23MY.
  • Dealers should ensure that all replacement orders needing to be submitted are verified in COVP.

SUMMARY
We were required to submit cancellations on certain scheduled 22MY Transit Connect orders due to supplier shortages at the Balance Out. Both stock and retail orders were impacted by these cancellations. Your Sales and Inventory teams will be able to provide a list of each dealer’s impacted orders. All allocation will be returned to the dealer as 23MY allocation in the coming wholesales. Not all allocation will likely be able to be replaced in one month. Impacted retail orders will need to be COVP verified and re-ordered as 23MY Transit Connects.