Jump to content

Jim58

Member
  • Posts

    81
  • Joined

  • Last visited

Everything posted by Jim58

  1. I also have x-plan but still going to push it. I have spent more money than PCO to keep old truck in shape. When order was placed I was told I would have it in October. As it is finally on a railcar somewhere we are hoping 1st week of February.
  2. Ask your GM or Sales Manager contact the Regional Manager to honor your PCO. This is part of a message from my fleet manager when we figured out my truck wouldn’t make it by the 3rd. “If it arrives after the fact I will do an exception request.”
  3. 1FT7W2BN9NED14810 Shipped via CSX TTGX851229 on 1/4 or 1/5. Looks like it my have been handed over to maybe UP Railroad as status is No Available tracking CSX. UP updates are always the same, On it’s way to Fairfax KS which is a lot more southern route than I thought it would take. So confirmation of Chicago to KC Kansas. Another rail line last shows that rail car in Texas back in November. Trying to figure out when to get Pre-Approved Auto Loan. Thanks again for your help.
  4. My trucked shipped on January 4 via CSX. Tracked the railcar to N. Baltimore OH, then it said it was heading towards Illinois. Today all I get is No Status Available. Truck will rail to Washington to be be placed on Ship to Alaska. So do I keep tracking via CSX or do have to figure out what Rail Company has the railcar and track through them. I tried tracking through Norfolk Southern mentioned in the above post but their last tracking for that car was in November in Texas.
  5. My uncle is a Chevy guy. He has tried to order a new 22 2500HD. Dealers around here won’t even talk to him yet, As they are not building 22 HD’s yet.
  6. 1FT7W2BN9NED14810 Happy New Year. Last update we missed the Big One - Chip Hold. Got “Built” email Friday but nothing since.
  7. I just got my Built email. So I am no longer in Chip Hold. My ETA is Feb 6
  8. Well all I can say then is FMC is clueless. Here is copy of Ford’s broke ass tracker and my VVR both give a December 31 ETA while truck is on so called Chip Hold. IF the truck had shipped the day it was produced and not sent to GFX it would have made it to Alaska towards the end of January 2022. It is minimum of 30 days ship to delivery to Anchorage Alaska. But if you are to look it up VIN is 1FT7W2BND14810. Maybe you see different stuff than my salesperson.
  9. You could be on Chip Hold. Estimated Delivery is probably date they expect the Chip/Module. Mine read the same way and it IS on Chip Hold.
  10. My truck was built on the 13th and placed on Chip Hold and still there. Ordered July 28.
  11. Nothing new here. Still on Chip Hold. Glad to see your was completed. The date on VVR for me is 31 December, but I think that date is date they expect the module to get to them. I will check with Cyberman on Monday when he comes back to work if I haven’t heard anything.
  12. Palsapp.com makes no sense to me. I can look up my VIN and it shows like the above picture. But for one my truck is on Chip Hold and number 2 my truck will be shipped by rail to Kent WA then placed on ship for transport to Alaska. Then Wrightway will truck it to dealership 5 miles from port. As far as I know Jack Cooper doesn’t touch mine.
  13. I never saw one. But then again my truck has been on order since July. Now on Chip hold
  14. If you are on “Chip Hold” your truck will probably sit there with mine for at least the next 3 weeks before they get touched again. Mine will be 32 days after build date when they come off of shutdown.
  15. What truck did you order? If it is a Super Duty, it comes from Kentucky Truck Plant.
  16. Hopefully it gets shipped tomorrow before the shutdown. And I just noticed from FTE site you are from South Louisiana. I grew up in Assumption and St. Mary parishes, with family In Thibodaux and Houma areas.
  17. Did you get your “Built” email and your shipped. Mine was built on the 13th and now on Chip Hold. So won’t ship before shutdown
  18. I am at 5 months right now. With KTP being shut down for next 3 weeks and 3.0 days for shipping, I will be at 7 months order to delivery.
  19. We are on FTE together too. Just left my dealership. Got a copy of VVR. My truck was built 13 December and placed on Chip Hold on the 15th. So earliest shipping date will now be after 17 January with 3.0 days to ship to dealership. So earliest I can see my truck will be mid February. If lucky I will be at 7 months order to delivery.
  20. He is on vacation until January 3. But he is under Ford Motor Company Employee Discussion Forum then Vehicle Locator. Follow the rules.
  21. Did you get your Truck is Built email or does tracker say built. If your build day was the 15th then probably not going to be finished until Wednesday or Thursday. Truck leaves KTP and goes across the road to GFX for your spray in, 5th wheel and hood deflector which on average takes a week. Mine was built on 12th and still at GFX.
×
×
  • Create New...