Recommended Posts

At the risk of having my forum priveleges suspended...can anyone shed light on how the Escape hybrid production runs are determined? Does the assembly line produce only hybrids for like a week at a time every couple of months depending on battery availability? I've been told that the gasoline engine models are "shut down" when enough hybrid components are available. Is this true?

 

Much appreciated if anyone can help out. Ford rocks.

Link to comment
Share on other sites

At the risk of having my forum priveleges suspended...can anyone shed light on how the Escape hybrid production runs are determined? Does the assembly line produce only hybrids for like a week at a time every couple of months depending on battery availability? I've been told that the gasoline engine models are "shut down" when enough hybrid components are available. Is this true?

 

Much appreciated if anyone can help out. Ford rocks.

They run the hybrid at x amount of units an hour. I don't remember the number. They do not shut down making the gasoline units. They have a certain mix they run based on the number of units per hour. Example: Overall production = 60 jph Hybrid = 10jph then every 6th unit would be a hybrid.

Link to comment
Share on other sites

They run the hybrid at x amount of units an hour. I don't remember the number. They do not shut down making the gasoline units. They have a certain mix they run based on the number of units per hour. Example: Overall production = 60 jph Hybrid = 10jph then every 6th unit would be a hybrid.

I've been told a max of 6 an hour due to battery, vender can only keep up with 6 an hour.

Link to comment
Share on other sites

So how many hybrids in a month would this make? 6 per hour over a 10 hour shift seems like a lot??? How many days in a month/quarter does the KC plant turn out Escapes?

 

Yet dealers/salesman are telling me that hybrids are produced for a week at time, only one week every 8 to 12 weeks. It's too bad dealers aren't informed or are just not up front...reading other forums and blogs on the net leaves me with the impression that lots of people are not being helped by their dealer/salesman.

 

Thanks all!

Link to comment
Share on other sites

So how many hybrids in a month would this make? 6 per hour over a 10 hour shift seems like a lot??? How many days in a month/quarter does the KC plant turn out Escapes?

 

Yet dealers/salesman are telling me that hybrids are produced for a week at time, only one week every 8 to 12 weeks. It's too bad dealers aren't informed or are just not up front...reading other forums and blogs on the net leaves me with the impression that lots of people are not being helped by their dealer/salesman.

 

Thanks all!

We build Aprox. 14 hybrids per hour, all of the time. We have three shifts a week, each working 40 hours per week. With line stoppage for breaks we produce roughly 1500 Hybrid Escapes a week.

Link to comment
Share on other sites

  • 3 weeks later...

Thanks all. One more question - my dealer tells me that my limited AWD hybrid will be picked up shortly, and he's hopeful the scheduled build day (can't remember the technical term) will come soon, before the break.

 

I'm doubtful, and if I understand you all correctly, the SUV side is down 27 days over Dec-Jan?

Link to comment
Share on other sites

Thanks all. One more question - my dealer tells me that my limited AWD hybrid will be picked up shortly, and he's hopeful the scheduled build day (can't remember the technical term) will come soon, before the break.

 

I'm doubtful, and if I understand you all correctly, the SUV side is down 27 days over Dec-Jan?

It looks as of now, that SUV production will be haulted Dec. 20 through Jan 10. This is always "subject to change!" Wish we could get our vehicles to waiting customers faster. Thanks for being patient!

Link to comment
Share on other sites

  • 2 weeks later...
It looks as of now, that SUV production will be haulted Dec. 20 through Jan 10. This is always "subject to change!" Wish we could get our vehicles to waiting customers faster. Thanks for being patient!

 

Anyone able to provide an update on the SUV production being halted at KC - is it still down until Jan 10? Much appreciated...trying to be patient but it's getting tough. Hang in there all.

Link to comment
Share on other sites

  • 2 weeks later...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead