So, my truck has been sitting at the rail yard, an hour and a half from my dealership, for three weeks now. It is waiting for for the transport company to deliver. Of course I've been tracking and watching the whole time and I have come up with the following:
United Road has the contract to deliver my truck. As soon as the truck was built, United Road assigned a load number and made it visible. I have looked at other loads United Road has delivered to my dealership, and every vehicle on the truck has the same load number, telling me the number is not vehicle specific. This tells me United Road schedules loads long before the vehicles reach the final rail yard. I can only assume, if one of the vehicles, assigned the same load number is delayed getting to the final rail yard, the whole load is delayed. Several other trucks have been delivered from the rail yard since mine has arrived and some built after mine.
I have no idea if this is the case, just my best deductive reasoning.