Jump to content

livinlogs

Member
  • Posts

    34
  • Joined

  • Last visited

Everything posted by livinlogs

  1. Did anyone get an email today ? I thought there were supposed to be three weeks of January scheduled today . Opening day order of plat, HO, Tremor . So I’m hoping I even get it , didn’t get the 23 ordered .
  2. Out of the blue my lariat ultimate tremor ppo 6.7 Ho shipped . Shocked and happy eta 4/20.
  3. I have lariat ultimate tremor pro power with 6.7 Ho that ordered 10/27. No vin yet . So there’s that
  4. I wondered about that as well . I have a 6.7 Ho tremor with pro power ordered 10/27 and still no vin or production date . Dealer says order confirmed but nothing else
  5. Any 23’s show up . Had a friend ordered same day as me 10/27 lariat 350 6.7 . His shipped last week . Mine still no vin or build . Same dealer . Mine has tremor , his doesn’t . Mine also has onboard power so maybe those are the things holding mine .
  6. I just had a friend buy a new hd truck . Ended up with a Duramax, couldn’t find a ford . I know this is off track. Loved the ram interior but got a deal on the Chevy . Ram dealer noted their biggest issue is selling the ram 6 sp auto against the 10 sp gm and ford . Just perceptions. They actually have materials to show why the 6 sp is better to help . I had a ram 3500 Ho with aisin. Obviously in a 350 6.7 now
  7. Yeah I’m priority 19 so probably last to be scheduled. No constraint options . Didn’t order anything considered job 2 but is the HO diesel . So maybe it will get scheduled for early summer
  8. Anyone get there 23 yet ? I’m still not scheduled, ordered 10/27/22
  9. Anyone see a 23 yet ? I saw that you tube video above
  10. Ordered 10/27/22 no constraints , still at unscheduled clean . I guess there isn’t anything that can predict scheduling based on what people are seeing with vehicles already built or on hold . Mine is a config with everything available job 1 . Guess I just have to be patient
  11. Ordered 10/27/22 no constraints , still at unscheduled clean . I guess there isn’t anything that can predict scheduling based on what people are seeing with vehicles already built or on hold . Mine is a config with everything available job 1 . Guess I just have to be patient
  12. That’s a bummer but now I know my 10/27 order that still doesn’t have a vin isn’t happening until after then and I’m wondering if I will even get a 23 model . I called Ford marketing last week and they saw my order as confirmed but still no build date . That’s weird that you have a build date 3 months from now . Do you have anything that was supposed to be job 2 build ?
  13. I’m assuming I’m like some of you on here . I see lots of posts where people got their vins and a date . I haven’t . Ordered 10/27/22. No trims or items that were supposed to be job 2 and still nothing . Is it likely I have nothing because I’m priority 19? I’m guessing that’s the case . Just wondering if there are others like me out there
  14. Built December 3 and delivered on the 22nd
  15. Mine built 12/3 and arrived in Utah at the dealer 12/22, sat around a week waiting for rail then moved pretty steady .
  16. Picked mine up today . Long trip cannot upload file but 12/3 build delivered 12.21.
  17. I cannot fathom how some trucks are sitting for months and others roll off the line and ship within a week . I’ did not expect my 22 to show and ordered a 23 first day. My 22 is showing up this week . With no reasoning given the thousands that apparently are sitting and waiting . I feel your upset and frustration. I wouldn’t be in business if I treated people this way . I’m not trying to start anything about Ford and supply chain or anything , but I can’t even see any logic to the process . Maybe I’m too simple minded . Merry Christmas, your truck will show up
  18. My platinum with tremor package built 12/3 at local rail yard delivery 12/22 and pdi and delivery 12/23 to me . Supposedly . Long journey. Will post a pic .
  19. I didn’t want to bug my dealer 4 times a week but the ford consumer site showed shipped for my truck built Dec 3. A few days ago it showed waiting for rail according to the dealer . As of today it’s on a train in Colorado . None of it makes sense knowing there are trucks that sat for months . I literally expected mine in march or something
  20. My 350 ccsb tremor built 12/3 shipped but waiting on rail . So shipped but not shipped
  21. I just saw this sticky on order track . No more tracking going forward
  22. Mine got finished 12/3 but awaiting shipping . It was built with no delays and as far as I can tell all modules full . Awaiting rail . Platinum tremor
×
×
  • Create New...