I'm not in a position to give estimates. What does your dealer say?

 

First week of December... Originally I was told mid-October so I'm not terribly trusting of the dates. My current car is a 1997 Chevy Prism which is eating as much oil as gas and won't start half the time so I have been renting but I don't want to keep renting if it's going to be two months. I'd really like the dealer to be straightfoward with me and say they have no idea when the car will ship or they're pretty sure it will ship by some date.

Link to comment
Share on other sites

  • Replies 1.2k
  • Created
  • Last Reply

Top Posters In This Topic

Can someone please track my order for my wife's new Edge Limited? VIN 2FMDK39C68BA30460.

VIN: 2FMDK39C68BA30460

 

Receipt Date: 10/11/2007

Serialize Date: 10/25/2007

Segment Date: 10/25/2007

Sequence Date: 11/8/2007

Blend Date: 11/9/2007

Produced Date:

Gate Release Date:

Ship Date:

Arrival Date:

Sold Date:

Link to comment
Share on other sites

I'd really like the dealer to be straightfoward with me and say they have no idea when the car will ship or they're pretty sure it will ship by some date.

Unfortunately the dealer has little to no control over what Ford decides to do in regards to when your order will be built. Since SYNC is a new feature that has a "commodity restriction" (meaning: that they have to limit the number of units scheduled until stock starts flowing into the plant), the fact that you've been serialized is a good thing -- it means that they are projected to have the parts necessary to build your vehicle on time.

 

I just went through the same thing on my own ordered vehicle -- I own one of the rare '08 Ranger FX4s that has a manual transmission. The option (funny, because the manual is standard equipment) was "late availability", it took over a month to get the vehicle serialized.

 

So try to have a little faith in your dealer. Like me, I'd rather not give you any information if it means I had to make up a BS story. ETAs in the Vehicle Visibility system change all the time -- factories have mechanical downtime that mess up the schedule, nothing of which the dealer can do anything about.

 

Might not be what you want to hear; but it's the truth.

Link to comment
Share on other sites

What is the difference between the Vehicle Visibility System (VVS) and the CONCEPS system? My wife's Edge shows up as "in production" on VVS and as already built on CONCEPS. But both have an ETA of 11/26/07. That sure seems fast to get it to southern KS all the way from Ontario, Canada. They must really have the rail/truck shipping lined out incredibly well. It is really fascinating learning about how the production system works. It would be a lot of fun to actually visit the factory. Last time I went through a factory was the GM Fairfax factory in KC in 1995. It was amazing then. I can't imagine how the process has changed since then.

Link to comment
Share on other sites

Could you please track the VIN # 1ZVHT82H785160741. (Window sticker would be awesome if available???)Thanks a bunch....Happy Thanksgiving... :hyper:

VIN: 1ZVHT82H785160741

 

Receipt Date: 10/29/2007

Serialize Date: 11/15/2007

Segment Date: 11/15/2007

Sequence Date:

Blend Date:

Produced Date:

Gate Release Date:

Ship Date:

Arrival Date:

Sold Date:

Link to comment
Share on other sites

Can I get an update of VIN# 1FTWW31R78EC86922

VIN: 1FTWW31R78EC86922

 

Receipt Date: 10/8/2007

Serialize Date: 10/25/2007

Segment Date: 10/25/2007

Sequence Date: 10/30/2007

Blend Date: 11/9/2007

Produced Date: 11/19/2007

Gate Release Date: 11/19/2007

Ship Date: 11/20/2007

Arrival Date:

Sold Date:

Link to comment
Share on other sites

VIN: 1ZVHT84N585156237

 

Receipt Date: 9/20/2007

Serialize Date: 11/1/2007

Segment Date: 11/1/2007

Sequence Date: 11/13/2007

Blend Date: 11/13/2007

Produced Date:

Gate Release Date:

Ship Date:

Arrival Date:

Sold Date:

 

Thanks so much for all your time and effort helping us out here track our vehicles. I know for sure I truly appreciate this service you are providing for us!!

 

So I have to ask hopefully 1 last time, can I get an update? I think this should be close to shipping now. If not, one question about Ford Mustang Manufacturing processes. What days do they shutdown over Thanksgiving week? Is it just Thursday and Friday or the entire week??

 

Again thanks so much and have a great vacation!!!

 

-- Matt

Link to comment
Share on other sites

May I check on my wife's new Edge Limited one more time? VIN 2FMDK39C68BA30460. It should be built and hopefully on its way.

 

VIN: 2FMDK39C68BA30460

 

Receipt Date: 10/11/2007

Serialize Date: 10/25/2007

Segment Date: 10/25/2007

Sequence Date: 11/8/2007

Blend Date: 11/9/2007

Produced Date: 11/19/2007

Gate Release Date: 11/19/2007

Ship Date: 11/19/2007

Arrival Date:

Sold Date: