Per Friday's FDNB (Fleet Distribution News Bulletin) below is the timetable for the 2021/2022MY Mustang.

 

  • 10/01/2021 - 2021MY Final Fleet Order Due Date
  • 10/14/2021 - 2021MY Last Day to Spec Change
  • 12/23/2021 - 2021MY Balance Out Date

 

  • 10/11/2021 - 2022MY Order Bank Open Date
  • 11/18/2021 - 2022MY Scheduling Begins
  • 01/03/2022 - 2022MY Job #1 Date

Share this post


Link to post
Share on other sites

hi there, do those dates apply for Canadian order as well?

Share this post


Link to post
Share on other sites
1 hour ago, smrtphur said:

hi there, do those dates apply for Canadian order as well?

 

They should since all Mustangs are built at FRAP (Flat Rock Assembly Plant). There may be slight differences for Canadian orders but I don't have access to specific Ford Canada information. The Canadian Mustang Order Guides, which are updated on a different schedule, are available for download at the Dealer Order Guides section. https://blueovalforums.com/forums/index.php?/files/category/15-mustang/  

Share this post


Link to post
Share on other sites
1 hour ago, ice-capades said:

 

They should since all Mustangs are built at FRAP (Flat Rock Assembly Plant). There may be slight differences for Canadian orders but I don't have access to specific Ford Canada information. The Canadian Mustang Order Guides, which are updated on a different schedule, are available for download at the Dealer Order Guides section. https://blueovalforums.com/forums/index.php?/files/category/15-mustang/  

yes I already downloaded the guide. Thank you for clarification :)

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×