Jump to content

Progress on Orders for Fusion Energi and Hybrid Titanium


taylorjd

Recommended Posts

Just checked and my sticker is now available! I hope that is a good sign for everything being on track to be built next week.

 

I hate you.

 

Order date: 10-Jan

Build to week: 20-May

Window sticker: Nope... /cry

Edited by shaggy314
Link to comment
Share on other sites

I hate you.

 

Order date: 10-Jan

Build to day: 20-May

Window sticker: Nope... /cry

 

I bet it shows up this week if you have 5/20 as well Shaggy. I hope so, it will be fun to see our cars move at the same time on the rail.

Link to comment
Share on other sites

Just got the call from Debbie at Ford. Scheduled to build DAY 24-May of week 20-May...

 

So, Friday or Saturday. I need to get the DB updated.

 

 

I still hate you, for your UPS delivery person, mine NEVER looks like that... :drool:

EDIT: Grammer police

Edited by shaggy314
Link to comment
Share on other sites

Just got the call from Debbie at Ford. Scheduled to build DAY 24-May...

 

So, Friday or Saturday. I need to get the DB updated.

 

 

I also hate you for your UPS delivery person, mine NEVER looks like that... :drool:

Updated.

 

I suppose I should check on a buid date for mine.

Link to comment
Share on other sites

DEAD STOP - Those of you with new cars, heads up. My HyTi literally stopped moving and the electric parking brake came on at an exit ramp stop. Couldn't disengage the brake. Took 20 minutes to finally get it going (with brake light still on) and headed straight for the Ford Dealership Service Bay.

 

I've got a thread here:

 

http://fordfusionhybridforum.com/topic/6669-electric-brake-came-on-and-hyti-wouldnt-budge/

Link to comment
Share on other sites

You all are incredible! This tread has keep up its pace and interest as one of the most active threads on the Forum with 126 pages, more 2,500 views and more then 56,000 views. Thanks Mailbu for keeping up the spreadsheet and thanks all for helping each other and for keeping each other informed on the progress of their orders. Very Cool!

  • Like 1
Link to comment
Share on other sites

You all are incredible! This tread has keep up its pace and interest as one of the most active threads on the Forum with 126 pages, more 2,500 views and more then 56,000 views. Thanks Mailbu for keeping up the spreadsheet and thanks all for helping each other and for keeping each other informed on the progress of their orders. Very Cool!

 

Thank you JD!! I agree, this Forum is soooo importand :) And I enjoy doing the spreadsheet. :)

  • Like 2
Link to comment
Share on other sites

Just got the call from Debbie at Ford. Scheduled to build DAY 24-May of week 20-May...

 

So, Friday or Saturday. I need to get the DB updated.

 

 

I still hate you, for your UPS delivery person, mine NEVER looks like that... :drool:

EDIT: Grammer police

 

Shaggy,

Your sticker is up today, the date at the bottom is May 20 2013 so if it goes the way they have been then your exact build date will be May 27th, next Monday.

 

You can verify but let me know if I should update the spreadsheet.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...