From what I have heard if your vin has bec in it it is a job 3 build. The difference is a stromger support piece in the rear and a 2 1/2 inch hitch shipped with a reducer
I am a little worried seen a post where KTP will be down next week. Hope it makes it out before then!!!!!! Thanks for all your help you have been great.
I placed my order on March 7 and it was built on March 24. But with the crisis in Japan I look for the build times to increase drasticly over the next few months.
Cycling power usually is a very good fix for some electrical problems when equipment stops responding. First thing I do at my plant when something will not start.
New member here. Found this site today while doing a search. I have always drove a ford since 16 years old, just last week ordered a superduty and trying to be patient for the 6-8 week lead time.